The apartment comprises an entrance hall, an open plan kitchen, living and dining area with two terraces, a utility room, a guest bathroom, three bedrooms, all with access to a terrace and with two of the bedrooms benefiting from en-suite faciliites.
The projected date of completion is in April 2025 with finishes including internal doors, flooring with insulation, ceilings, internal walls, lighting, bathrooms, central air conditioning, ventilation system, fire safety, a backup generator and three lifts serving the block. Underground parking is available at an extra cost.